After drilling minimize water and residue left behind in the holes before using product.
Within 10 minutes of mixing pour the product into the holes filling within to 1 from the top.
Continuously pour the mixture into the holes one at a time to ensure no air gaps are trapped within.
Goto Sanqiang Building Material to know more.
For horizontal and slant holes, insert a slightly smaller plastic pipe into the hole, and then fill the expansive slurry into the pipe slowly, withdrawing the pipe from the hole simultaneously then cap it.
Do not leave any surplus mixture in the bucket use all remaining expansive mortar slurry.
After the holes have been filled keep out of sunlight, cover with a tarp and do NOT look into the holes.
For best results allow product to set for 24 hrs (product will continue to expand up to 48 hrs).